Middle East Division

The company’s Middle East Division has an office located on Bagram Airfield (BAF), Afghanistan. We have a complete management and work force team with expertise in civil construction, mechanical/HVAC, low and high voltage electrical work, and earth moving. We have the structural construction capabilities for projects incorporating CAD FrameCad based structures, pre-engineered buildings (PEB), insulated concrete forms (ICF), concrete masonry unit (CMU), pre-det roof systems and concrete B-Hut manufacturing. This is supported by our 600m3 per day capacity concrete batch plant, concrete testing lab with ACI certified technician and steel form work located on BAF in the vicinity of ECP3.  In addition, we have leadership and staff licensed and trained for environmental/hazmat clean up.
 

014_preview.jpeg

Construction

JSI construction projects are completed in accordance with, but not limited to International Building Code (IBC); National Electric Code (NEC) –
NFPA 70 International Fire Code; International Plumbing Code; International Mechanical Code; ACI 318 Building Code Requirements for Structural Concrete; ACI 347R-14 Guide to Formwork for Concrete; ASTM D1557
Unified Facilities Criteria (UFC).

Concrete Placement Bagram Field USACE Project_preview.jpeg

Concrete

We continuously are placing concrete in our civil projects – roads, vertical structures, and airport ramps/runways. So it was only natural to take the next logical step by obtaining several concrete batch and asphalt plants for our inventory. This enhanced our services for concrete on government installations as well as commercial venues in the Middle East.

.

Environmental

To provide critical environmental services to an ever changing the planet, JS INT’L, INC. (JSI), has assembled a team of Professionals to meet this unique challenge. While most of our clients know JSI for our quality construction, we also offer a robust environmental Services Group encompassing a wide variety of experience and unique capabilities.

Scanner Replacement.jpg

BAF team was able to remove and replace out of service Force Protection scanner in less than 3 1/2 hrs

IMG_3009.jpg

BAF team with another successfully completed concrete project

Sidewalk Construction.jpg

BAF team at their recent completed project

FB_IMG_1515650955996.jpg

Congratulations to our BAF team on their special commendation received from the ASG on their T-Wall Construction / Concrete Production project.